Environmental protection technical transformation project publicity document

Hand-in-hand company has an annual output of 15 million new energy connectors,
360,000 sets of smart shelves, 1 million cake machine components,
Mold and oxidation process technical transformation project
Environmental Impact Assessment Announcement Information
1. Basic situation of construction projects
Project title:Hand-in-hand company has an annual output of 15 million new energy connectors, 360,000 sets of smart shelves,
One million cake machine components, molds and oxidation process technical transformation project
Construction unit:Zhejiang Hand-in-Hand Electric Appliance Technology Co., Ltd.
Construction nature:remodel
Construction Content:Zhejiang Hand-in-Hand Electric Appliance Technology Co., Ltd. is mainly engaged in household appliances (non-stick cookware, rice cookers
Production of pots, pressure cookers, heat preservation covers, etc.). Now in order to adapt to market demand and achieve better economic benefits and
To achieve social benefits, the existing factory buildings are used for production, and new hydraulic presses, stamping machines, ordinary oxidation lines and other equipment are purchased.
equipment, the original 1 large general oxygen line was transformed into 5 small oxidation lines. After the implementation of this project, an additional annual output of 15 million will be formed.
It has the production capacity of only new energy connectors, 360,000 sets of smart shelves, and 1 million cake machine components. Enterprise in 2022
The project registration was completed on October 19, 2019 (project code: 2210-330451-07-02-341420).
2. Distribution of major sensitive targets within the scope of environmental impact assessment
The closest sensitive point to the project is the Sheng'an Community about 280m southeast of the project, while other sensitive targets are further away.
3. Forecast of major environmental impacts
1. Ambient air.Each common oxygen line is surrounded by soft curtains and adopts "trough surface" (chemical polishing tank, neutralizing tank,
The general oxygen tank) facility side suction + top suction" collects the waste gas from the general oxygen line, and then enters a set of "alkali spray" equipment after collection
After treatment, it is discharged through a 20m high exhaust pipe; there are a total of 5 general oxygen lines in this project, so there are a total of 5
A 20m high exhaust pipe (DA007~DA011); the oil fume exhaust gas is processed by an environmentally friendly oil fume purification device
emission. After adopting the above measures, all emissions can meet the emission standards and have little impact on the surrounding environment and sensitive points. - 2 -
2. Surface water.Production wastewater (general oxygen line wastewater, exhaust gas spray wastewater, circulating cooling drainage) passes through the factory area
After treatment at the existing sewage treatment station, part of it is recycled into oxidation line cleaning water and waste gas spray water, and the rest of the wastewater
Together with the domestic sewage that has been pre-treated by grease traps and septic tanks, it will be included in the sewage treatment project interception pipe network.
After the treatment reaches the standard, it will be discharged into the sea, which will have basically no impact on the environmental quality of the surrounding inland water.
3. Solid waste.All solid waste can be properly classified and disposed of, with little impact on the external environment.
4. Acoustic environment.After the implementation of this project, the noise value at the west side of the factory boundary reaches the "Environmental Noise Emissions at the Factory Boundary of Industrial Enterprises".
Standard" (GB12348-2008), the noise value of the remaining three sides of the factory boundary reaches the "Industrial Enterprise Factory Boundary"
The Category 3 standard in the "Environmental Noise Emission Standard" (GB12348-2008) has little impact on the surrounding environment.
5. Groundwater and soil.After taking corresponding pollution prevention and control measures, this project will have little impact on groundwater and soil environment.
6. Environmental risks.The main environmental risks of this project are leakage of raw materials, hazardous waste, wastewater, etc.
with risk prevention measures, the probability of leakage accidents can be effectively reduced and its environmental impact can be further mitigated,
project environmental risks are bearable.
4. Main environmental protection measures, environmental risk prevention measures and expected effects to be taken
1. Exhaust gas.A soft curtain is set around each common oxygen line, and a "trough surface" (chemical polishing groove, neutralizing groove, general oxygen line) is used.
Oxygen tank) facility side suction + top suction" collects the waste gas from the general oxygen line. After collection, it enters a set of "alkali spray" device for treatment. After treatment, it is discharged through a 20m high exhaust pipe; there are a total of 5 general oxygen lines in this project line, therefore, there are a total of 5 20m high exhaust pipes (DA007~DA011); the oil fume exhaust gas is discharged after being treated by an environmentally friendly certified oil fume purification device.
The exhaust gas can meet the emission standards.
2. Wastewater.Production wastewater (general oxygen line wastewater, exhaust gas spray wastewater, circulating cooling drainage) is treated by the existing sewage treatment station in the factory and is partially recycled into oxidation line cleaning water and exhaust gas spray water. The rest of the wastewater is treated with the grease trap and chemical Domestic sewage after pretreatment in the septic tanks will be included in the sewage interception pipe network of the sewage treatment project, and will be discharged into the sea after centralized treatment to meet standards. The factory area implements the diversion of clean sewage and rainwater sewage.
3. Solid waste.In this project, solid waste is collected and stored in a classified manner. Hazardous waste is entrusted to qualified units for disposal. General solid waste is reused or entrusted to the environmental sanitation department for harmless treatment. In the end, all solid waste can be properly disposed of.
4. Noise.This project uses advanced low-noise equipment, arranges the location of the equipment reasonably, strengthens daily maintenance and upkeep of the equipment, does a good job in greening and maintenance of the factory area, and strives to create a green barrier. - 3 -
5. Groundwater and soil.This project will effectively implement the collection and transportation of wastewater and the storage of various solid wastes and raw materials; take measures to harden the floors, prevent seepage, anti-corrosion, and prevent leakage in the production workshops and factory raw material warehouses; and implement general solid waste warehouses and temporary storage of hazardous wastes. Take anti-seepage measures as required from time to time; strengthen production management to avoid run-off, leakage, dripping and leakage during the production process, minimize environmental risks and accidents caused by pollutant leakage, and do daily groundwater and soil protection work.
5. Risk prevention.Conscientiously implement the policy of "safety first, prevention first" and strictly abide by relevant hazardous chemicals safety management regulations. Strengthen risk prevention and control in various sections of production, storage, and transportation, equip with emergency supplies and equipment, and take emergency collection and cut-off measures for wastewater.
5. Preliminary conclusions of environmental impact assessment
According to the environmental impact assessment analysis, as long as the construction unit conscientiously implements various pollution prevention and control countermeasures and environmental management requirements proposed in this assessment, strictly implements the "three simultaneous" policy, and minimizes pollutant emissions, the construction of this project can meet all environmental impact assessment approvals principles, environmental impact assessment approval requirements and “three lines and one order” management requirements.
6. Environmental impact assessment review and request for supplementary information
During this round of publicity, you can check the environmental impact assessment brief copy and request supplementary information from the environmental impact assessment unit or construction unit by phone, email, etc.
7. Scope of objects and main matters for soliciting opinions
Scope of consultation:Communities surrounding this project, etc.
Main things:(1) Environmental issues of public concern, (2) Approval attitude towards the project, (3) Opinions on the impact of the project construction on the surrounding environment, (4) Opinions and suggestions on the environmental protection work of the project.
8. Specific forms for soliciting public opinions
This publicity is mainly carried out by posting announcements in the communities surrounding the project, and at the same time, it is publicized online. You can report your environmental protection opinions to the construction unit or environmental assessment unit by phone, letter, email, etc. (preferably in writing), or directly to the environmental assessment approval unit in the same way. Please leave your contact information, such as name, address, phone number, email, etc., to provide feedback on how your opinions are handled.
9. Starting and ending time for public opinions
If the public has questions, comments or suggestions about the environmental issues of this project, please contact the construction unit, Contact the environmental assessment unit or approval unit. - 4 -
10. Contact information
Construction unit: Zhejiang Hand in Hand Electrical Technology Co., Ltd.
Unit address: No. 3418, Wanguo Road, Jiaxing Economic and Technological Development Zone
Contact number: 18667310001 Contact person: Mr. Li
Environmental impact assessment unit: Jiaxing Youchuang Environmental Technology Co., Ltd.
Unit Address: Room 303 South, Building 1, Xinghui Plaza, No. 1054 Tanghui Road, Jiaxing Economic and Technological Development Zone
Postal code: 314000 Contact number: 13736423861 Contact person: Zheng Gong
Approval unit: Jiaxing Municipal Ecological Environment Bureau Economic and Technological Development Zone Branch
Contact number: 0573-89973951
Zhejiang Hand-in-Hand Electric Appliance Technology Co., Ltd.
February 1, 2024